Welcome to Winsun (HK) Electronics Limited!
+86-(0755)8253 3846
Home Products Package 479-BBGA, FCBGA
Back to Package Finder PACKAGE RESULTS

479-BBGA, FCBGA Package Parts

Use this page to review components associated with the 479-BBGA, FCBGA package or case.

Compare manufacturer and stock references below, then open a product or add it directly to your sourcing request.

MATCHING PARTS 5 Results
PART NUMBER RESULTS

Matching 479-BBGA, FCBGA Components

Compare sourcing references and open a part for full technical information.

PART NUMBER RJ80535LC0051M IC MPU INTEL 1.1GHZ 479FCBGA
Manufacturer Intel
Package / Case 479-BBGA, FCBGA
Stock Reference 1,822
View Part
PART NUMBER RJ80535GC0251M IC MPU INTEL 1.6GHZ 479FCBGA
Manufacturer Intel
Package / Case 479-BBGA, FCBGA
Stock Reference 1,092
View Part
PART NUMBER RJ80530VY650256 IC MPU INTEL CEL 650MHZ 479BGA
Manufacturer Intel
Package / Case 479-BBGA, FCBGA
Stock Reference 1,464
View Part
PART NUMBER NK80530VY650256 IC MPU INTEL CEL 650MHZ 479BGA
Manufacturer Intel
Package / Case 479-BBGA, FCBGA
Stock Reference 19,995
View Part
COMMON QUESTIONS

479-BBGA, FCBGA Package FAQ

Quick guidance for selection and sourcing.

What does the 479-BBGA, FCBGA package describe?

479-BBGA, FCBGA is a package or case designation used by compatible electronic components. Mechanical dimensions, pin count and pin configuration should be confirmed against the manufacturer datasheet.

Does the same 479-BBGA, FCBGA package mean two parts are interchangeable?

No. Matching package dimensions do not guarantee electrical or functional compatibility. Always verify the complete part number and technical specifications before substitution.

How can I source components in the 479-BBGA, FCBGA package?

Select a matching part below or send your BOM and required quantities to Winsun (HK) Electronics for availability and quotation support.

GLOBAL COMPONENT SOURCING

Need a Different Option for 479-BBGA, FCBGA?

Send the exact part number, manufacturer and quantity. Winsun (HK) Electronics can review availability, lead time, shortage requirements and possible alternatives.