Welcome to Winsun (HK) Electronics Limited!
+86-(0755)8253 3846
Back to Package Finder PACKAGE RESULTS

SOT-143R Package Parts

Use this page to review components associated with the SOT-143R package or case.

Compare manufacturer and stock references below, then open a product or add it directly to your sourcing request.

MATCHING PARTS 56 Results
PART NUMBER RESULTS

Matching SOT-143R Components

Compare sourcing references and open a part for full technical information.

PART NUMBER NE85639R-T1-A RF TRANS NPN 12V 9GHZ SOT143R
Manufacturer CEL
Package / Case SOT-143R
Stock Reference 6,697
View Part
PART NUMBER NE85639R-T1 RF TRANS NPN 12V 9GHZ SOT143R
Manufacturer CEL
Package / Case SOT-143R
Stock Reference 7,883
View Part
PART NUMBER NE68139R-T1 RF TRANS NPN 10V 9GHZ SOT143R
Manufacturer CEL
Package / Case SOT-143R
Stock Reference 7,892
View Part
PART NUMBER NE68139R-T1-A RF TRANS NPN 10V 9GHZ SOT143R
Manufacturer CEL
Package / Case SOT-143R
Stock Reference 5,510
View Part
PART NUMBER NE68039R-T1-A RF TRANS NPN 10V 10GHZ SOT143R
Manufacturer CEL
Package / Case SOT-143R
Stock Reference 6,026
View Part
COMMON QUESTIONS

SOT-143R Package FAQ

Quick guidance for selection and sourcing.

What does the SOT-143R package describe?

SOT-143R is a package or case designation used by compatible electronic components. Mechanical dimensions, pin count and pin configuration should be confirmed against the manufacturer datasheet.

Does the same SOT-143R package mean two parts are interchangeable?

No. Matching package dimensions do not guarantee electrical or functional compatibility. Always verify the complete part number and technical specifications before substitution.

How can I source components in the SOT-143R package?

Select a matching part below or send your BOM and required quantities to Winsun (HK) Electronics for availability and quotation support.

GLOBAL COMPONENT SOURCING

Need a Different Option for SOT-143R?

Send the exact part number, manufacturer and quantity. Winsun (HK) Electronics can review availability, lead time, shortage requirements and possible alternatives.