Welcome to Winsun (HK) Electronics Limited!
+86-(0755)8253 3846
Home Products Package TO-262-3 Long Leads, I2PAK, TO-262AA
Back to Package Finder PACKAGE RESULTS

TO-262-3 Long Leads, I2PAK, TO-262AA Package Parts

Use this page to review components associated with the TO-262-3 Long Leads, I2PAK, TO-262AA package or case.

Compare manufacturer and stock references below, then open a product or add it directly to your sourcing request.

MATCHING PARTS 1358 Results
PART NUMBER RESULTS

Matching TO-262-3 Long Leads, I2PAK, TO-262AA Components

Compare sourcing references and open a part for full technical information.

PART NUMBER NTSB40120CT-1G DIODE ARRAY SCHOT 120V 20A TO262
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 5,351
View Part
PART NUMBER MBRB30H30CT-1G DIODE ARRAY SCHOTT 30V 15A TO262
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 6,243
View Part
PART NUMBER NTSB40100CT-1G DIODE ARRAY SCHOT 100V 20A TO262
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 4,313
View Part
PART NUMBER MBRB41H100CT-1G DIODE ARRAY SCHOT 100V 20A TO262
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 5,110
View Part
PART NUMBER NTSB20U100CT-1G DIODE ARRAY SCHOT 100V 10A TO262
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 2,430
View Part
PART NUMBER NTSB60100CT-1G DIODE ARRAY SCHOT 100V 30A TO262
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 7,089
View Part
COMMON QUESTIONS

TO-262-3 Long Leads, I2PAK, TO-262AA Package FAQ

Quick guidance for selection and sourcing.

What does the TO-262-3 Long Leads, I2PAK, TO-262AA package describe?

TO-262-3 Long Leads, I2PAK, TO-262AA is a package or case designation used by compatible electronic components. Mechanical dimensions, pin count and pin configuration should be confirmed against the manufacturer datasheet.

Does the same TO-262-3 Long Leads, I2PAK, TO-262AA package mean two parts are interchangeable?

No. Matching package dimensions do not guarantee electrical or functional compatibility. Always verify the complete part number and technical specifications before substitution.

How can I source components in the TO-262-3 Long Leads, I2PAK, TO-262AA package?

Select a matching part below or send your BOM and required quantities to Winsun (HK) Electronics for availability and quotation support.

GLOBAL COMPONENT SOURCING

Need a Different Option for TO-262-3 Long Leads, I2PAK, TO-262AA?

Send the exact part number, manufacturer and quantity. Winsun (HK) Electronics can review availability, lead time, shortage requirements and possible alternatives.