Welcome to Winsun (HK) Electronics Limited!
+86-(0755)8253 3846
Home Products Package TO-262-3 Long Leads, I2PAK, TO-262AA
Back to Package Finder PACKAGE RESULTS

TO-262-3 Long Leads, I2PAK, TO-262AA Package Parts

Use this page to review components associated with the TO-262-3 Long Leads, I2PAK, TO-262AA package or case.

Compare manufacturer and stock references below, then open a product or add it directly to your sourcing request.

MATCHING PARTS 1358 Results
PART NUMBER RESULTS

Matching TO-262-3 Long Leads, I2PAK, TO-262AA Components

Compare sourcing references and open a part for full technical information.

PART NUMBER FQI13N50CTU MOSFET N-CH 500V 13A I2PAK
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 6,635
View Part
PART NUMBER FQI10N60CTU MOSFET N-CH 600V 9.5A I2PAK
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 3,683
View Part
PART NUMBER FQI4P40TU MOSFET P-CH 400V 3.5A I2PAK
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 7,806
View Part
PART NUMBER FQI27P06TU MOSFET P-CH 60V 27A I2PAK
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 6,807
View Part
PART NUMBER FQI3P50TU MOSFET P-CH 500V 2.7A I2PAK
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 5,926
View Part
PART NUMBER FDI3632 MOSFET N-CH 100V 12A/80A I2PAK
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 8,077
View Part
PART NUMBER FDI2532 MOSFET N-CH 150V 8A/79A I2PAK
Manufacturer onsemi
Package / Case TO-262-3 Long Leads, I2PAK, TO-262AA
Stock Reference 2,842
View Part
COMMON QUESTIONS

TO-262-3 Long Leads, I2PAK, TO-262AA Package FAQ

Quick guidance for selection and sourcing.

What does the TO-262-3 Long Leads, I2PAK, TO-262AA package describe?

TO-262-3 Long Leads, I2PAK, TO-262AA is a package or case designation used by compatible electronic components. Mechanical dimensions, pin count and pin configuration should be confirmed against the manufacturer datasheet.

Does the same TO-262-3 Long Leads, I2PAK, TO-262AA package mean two parts are interchangeable?

No. Matching package dimensions do not guarantee electrical or functional compatibility. Always verify the complete part number and technical specifications before substitution.

How can I source components in the TO-262-3 Long Leads, I2PAK, TO-262AA package?

Select a matching part below or send your BOM and required quantities to Winsun (HK) Electronics for availability and quotation support.

GLOBAL COMPONENT SOURCING

Need a Different Option for TO-262-3 Long Leads, I2PAK, TO-262AA?

Send the exact part number, manufacturer and quantity. Winsun (HK) Electronics can review availability, lead time, shortage requirements and possible alternatives.