Welcome to Winsun (HK) Electronics Limited!
+86-(0755)8253 3846
Back to Series Finder SERIES RESULTS

2037 Series Parts

Use this page to review components grouped under the 2037 series.

Compare manufacturer, package and stock references below, then open a product or add it directly to your sourcing request.

MATCHING PARTS 46 Results
PART NUMBER RESULTS

Matching 2037 Components

Compare sourcing references and open a part for full technical information.

PART NUMBER 2037-23-B5 GDT 230V 5KA 2 POLE THROUGH HOLE
Manufacturer Bourns Inc.
Package / Case Axial Cylinder, Radial Bend
Stock Reference 4,794
View Part
PART NUMBER 2037-20-B5 GDT 200V 5KA 2 POLE THROUGH HOLE
Manufacturer Bourns Inc.
Package / Case Axial Cylinder, Radial Bend
Stock Reference 6,315
View Part
PART NUMBER 2037-60-B GDT 600V 5KA 2 POLE THROUGH HOLE
Manufacturer Bourns Inc.
Package / Case Axial Cylinder
Stock Reference 3,549
View Part
PART NUMBER 2037-42-B GDT 420V 5KA 2 POLE THROUGH HOLE
Manufacturer Bourns Inc.
Package / Case Axial Cylinder
Stock Reference 9,682
View Part
PART NUMBER 2037-35-B GDT 350V 5KA 2 POLE THROUGH HOLE
Manufacturer Bourns Inc.
Package / Case Axial Cylinder
Stock Reference 8,953
View Part
COMMON QUESTIONS

2037 Series FAQ

Quick guidance for selection and sourcing.

What does the 2037 series represent?

2037 is used to group related components within a product family. Exact specifications and compatibility should always be confirmed against the manufacturer documentation.

How do I request pricing for a 2037 part?

Choose a matching part below and add it to your sourcing request, or send the manufacturer part number and quantity through the RFQ page.

Can Winsun (HK) Electronics help with shortage or obsolete 2037 parts?

Yes. We can review current sourcing channels, lead-time options and possible alternatives for shortage, EOL and hard-to-find requirements.

GLOBAL COMPONENT SOURCING

Need a Different Option for 2037?

Send the exact part number, manufacturer and quantity. Winsun (HK) Electronics can review availability, lead time, shortage requirements and possible alternatives.