Welcome to Winsun (HK) Electronics Limited!
+86-(0755)8253 3846
Back to Series Finder SERIES RESULTS

HHM Series Parts

Use this page to review components grouped under the HHM series.

Compare manufacturer, package and stock references below, then open a product or add it directly to your sourcing request.

MATCHING PARTS 100 Results
PART NUMBER RESULTS

Matching HHM Components

Compare sourcing references and open a part for full technical information.

PART NUMBER HHM22137A2 RF DIR COUPLER 698-2620MHZ 0603
Manufacturer TDK
Package / Case 0603 (1608 Metric), 6 PC Pad
Stock Reference 5,493
View Part
PART NUMBER HHM2952A1 DIRECTIONAL COUPLER 3.4-5.95GHZ
Manufacturer TDK
Package / Case 0402 (1005 Metric), 6 PC Pad
Stock Reference 9,533
View Part
PART NUMBER HHM2955A1 DIRECTIONAL COUPLER 1.4-5.95GHZ
Manufacturer TDK
Package / Case 0402 (1005 Metric), 6 PC Pad
Stock Reference 7,031
View Part
PART NUMBER HHM22152A2 RF DIR COUPLER 450-3800MHZ 1608
Manufacturer TDK
Package / Case 0603 (1608 Metric), 6 PC Pad
Stock Reference 14,743
View Part
PART NUMBER HHM22139A2 MULTILAYER DIRECTIONAL COUPLER F
Manufacturer TDK
Package / Case 0603 (1608 Metric), 6 PC Pad
Stock Reference 6,681
View Part
COMMON QUESTIONS

HHM Series FAQ

Quick guidance for selection and sourcing.

What does the HHM series represent?

HHM is used to group related components within a product family. Exact specifications and compatibility should always be confirmed against the manufacturer documentation.

How do I request pricing for a HHM part?

Choose a matching part below and add it to your sourcing request, or send the manufacturer part number and quantity through the RFQ page.

Can Winsun (HK) Electronics help with shortage or obsolete HHM parts?

Yes. We can review current sourcing channels, lead-time options and possible alternatives for shortage, EOL and hard-to-find requirements.

GLOBAL COMPONENT SOURCING

Need a Different Option for HHM?

Send the exact part number, manufacturer and quantity. Winsun (HK) Electronics can review availability, lead time, shortage requirements and possible alternatives.