Welcome to Winsun (HK) Electronics Limited!
+86-(0755)8253 3846
Home Products Series SIDACtor®
Back to Series Finder SERIES RESULTS

SIDACtor® Series Parts

Use this page to review components grouped under the SIDACtor® series.

Compare manufacturer, package and stock references below, then open a product or add it directly to your sourcing request.

MATCHING PARTS 1549 Results
PART NUMBER RESULTS

Matching SIDACtor® Components

Compare sourcing references and open a part for full technical information.

PART NUMBER P2300EALAP THYRISTOR 190V 150A TO-226-2
Manufacturer Littelfuse Inc.
Package / Case TO-226-2, TO-92-2 (TO-226AC) Formed Leads
Stock Reference 7,988
View Part
PART NUMBER P1800EALAP THYRISTOR 170V 150A TO-226-2
Manufacturer Littelfuse Inc.
Package / Case TO-226-2, TO-92-2 (TO-226AC) Formed Leads
Stock Reference 8,384
View Part
PART NUMBER P1500EALAP THYRISTOR 140V 150A TO-226-2
Manufacturer Littelfuse Inc.
Package / Case TO-226-2, TO-92-2 (TO-226AC) Formed Leads
Stock Reference 7,701
View Part
PART NUMBER P1300EALAP THYRISTOR 120V 150A TO-226-2
Manufacturer Littelfuse Inc.
Package / Case TO-226-2, TO-92-2 (TO-226AC) Formed Leads
Stock Reference 7,104
View Part
COMMON QUESTIONS

SIDACtor® Series FAQ

Quick guidance for selection and sourcing.

What does the SIDACtor® series represent?

SIDACtor® is used to group related components within a product family. Exact specifications and compatibility should always be confirmed against the manufacturer documentation.

How do I request pricing for a SIDACtor® part?

Choose a matching part below and add it to your sourcing request, or send the manufacturer part number and quantity through the RFQ page.

Can Winsun (HK) Electronics help with shortage or obsolete SIDACtor® parts?

Yes. We can review current sourcing channels, lead-time options and possible alternatives for shortage, EOL and hard-to-find requirements.

GLOBAL COMPONENT SOURCING

Need a Different Option for SIDACtor®?

Send the exact part number, manufacturer and quantity. Winsun (HK) Electronics can review availability, lead time, shortage requirements and possible alternatives.